Just a quick note to say thank you, to you and your team, for delivering the air handling unit on the above project. You had to survey, price and then go into manufacture to meet timescales and then to better the original delivery & installation date was superb.

We have been both impressed with the speedy response we received from you and the pro-active nature you dealt with the project from start to finish has enabled us as a team to deliver the unit on time.

Equally, please pass my gratitude onto the site team who carried out a difficult task in site assembling the unit in a reduced time period but it went without a hitch and again they too were most pro-active throughout.

Finally just to say the finished product was both of high quality and perfectly measured to match the foot print of the existing unit and would have no hesitation to both recommending you and hopefully working with you again on future work.

Please pass on my thanks to the entire team involved.

Andrew Dunning
Director, Woodward & Co (Environmental) Ltd

__________________________________________________________________________________

The unit for Jarrow was delivered on time, well protectively packaged and fitted into place without incident.  When the wraps came off, the external quality of the product was very evident, but it was when it was first operated that the unseen elements and inbuilt control systems came into their own.

The unit was commissioned by IPT and run, it was then isolated and left switched off whilst the other elements of the building were finished.  The main building management system was not finished, so the pool water heating was going to be delayed until all the units were running.  This is where the unit excelled, it was ran and operated completely independently from the BMS.  It fully controlled the humidity and temperature in the main pool hall whilst the water was being treated and other commissioning processes were happening.

This meant the pool water heating came off the critical path and the project was completed without the possible one week delay envisaged.

David Wright 
Director, Desco UK